quickly, clearly and without complications

Simple process, precise implementation

Our process is designed to enable you to complete your project quickly and safely without unnecessary delays. From model selection to final installation, every step is optimized for maximum efficiency, transparency and control.
Capsule Modern House Cottages
Simple process

From idea to move-in in 4 steps

The Capsule process is designed to be transparent and stress-free — from the first consultation to the keys in hand, you always know where you are.

Consultation and selection of models

It all starts with a free consultation — by phone, online, or in person. Together, we define your needs, budget and location, and recommend the optimal model and configuration.

  • Free first consultation
  • Analysis of your parcel and location
  • Model recommendation according to budget and needs
  • Free first consultation
Capsule Modern House Cottages

Customization and order confirmation

After choosing a model, we define all the details of customization — room layout, materials, colors, equipment and additional options. You get a 3D visualization before confirming your order.

  • Free first consultation
  • Selection of interior and exterior equipment
  • Fixed-price contract
  • Confirmation of delivery times
Capsule Modern House

Production and delivery

We build your home in controlled factory conditions — precisely, efficiently and regardless of the weather. Upon completion, we transport it directly to your location.

  • Factory production (4-6 weeks)
  • Quality control at every stage
  • Delivery to the location by special transport
  •  Real-time order status tracking
Capsule Modern House model house

Consultation and selection of models

Our team of expert installers sets the home on the prepared foundation in 3-7 working days. After the final inspection and handover, the keys are yours.

  • Laying on foundations or piles (3–7 days)
  • Connection to infrastructure (electricity, water, drainage)
  • Final inspection and test of all systems
  • Handover with technical documentation
Capsule Modern House model house
Timeline

Realistic expectations

Transparency is our principle — here's what you can expect at every stage of the process.

  • Consultation and selection

    We agree on the details, finalize the configuration and sign the contract.

  • Factory Manufacturing 

    Your home is made in controlled conditions. We send regular status reports.

  • Transport Delivery

    The module is delivered to your location by a special vehicle.

  • Installation 

    3-7 working days for installation, connection and final inspection.

  • Moving in

    Handover of keys and technical documentation. Welcome home.

Ready to get started?

Contact us today — free consultation, quick response, concrete quote.

Installation

What needs to be prepared?

Before the arrival of our team, it is necessary to ensure several prerequisites. We help you through the entire process — including advice on foundations, connections, and permits.

Flat, accessible location (min. 4 m access width)

Prepared foundations or concrete piles

Connection to the mains or solar system

Required permits or applications (we help with documentation)

Required permits or applications (we help with documentation)

Capsule Modern House model houseCapsule Modern House T3 modelCapsule Modern HouseCapsule Modern House model houseCapsule Modern House V7 model